MetEngUK solves problems for Rio Tinto

MetEngUK solves problems for Rio Tinto

"Your checks were useful for helping locate the problem and the problem has now been resolved. "

The coal-fired power station at Lynemouth in Northumberland is operated by Rio Tinto Alcan, with most of the electricity produced used in the production of aluminium in a nearby smelter. The cost-effectiveness of the generation process depends to some extent on the quality of the fuel used, and when the wind direction is such that it carries exhaust gases inland, higher quality and more expensive fuel must be burnt.

In 2009, MetEngUK was asked to survey and report on the existing meteorological systems, as there was some inconsistency between data from the two monitoring sites.

Over the next two years, MetEngUK replaced the wind systems at both sites with high-quality digital sensors feeding analogue converters to readily inteface with Rio Tinto Alcan's existing data logging systems.

Data from the two monitoring sites has since shown satisfactory correlation.

Return to main list

Latest News
New met systems for Wycombe Air Park
07 th Sep

New met systems for Wycombe Air Park

New PTU systems for Booker

Read more

Bolton Wanderers Football Club works with MetEngUK

Bolton Wanderers Football Club

Premier League Football Club calls on MetEngUK for professional automatic weather station “They (MetEngUK staff) will always offer advice on the different approaches that we can take.” “T...

Read more