Marshall Aerospace today placed an order with MetEngUK more >
MetEngUK engineers were called to Scottish Power’s Rye House power station, near Hoddesdon, Herts., today to resolve problems with the operational wind indicating system, and investigate the loss of data from a temperature measuring system.
more >The old wind sensors at Portsmouth Commercial Port had given trouble for many years, and on 4 August 2003, were finally replaced by a modern Vaisala system based on the WD30 averaging wind display unit.
more >An initial servicing visit to Belfast City Airport was carried out today by MetEngUK engineers. The company is delighted to have won the long-term contract to provide Belfast City Airport with annual calibration and maintenance services for the suite of operational meteorological sensors and systems installed at the airport.
more >Met Engineering Limited today completed the installation and commissioning of a Vaisala PA50 aviation barometer system at Walney Island Airfield in Cumbria. The system, as ordered by BAE Systems, includes sensors and other equipment to provide displays of accurate air temperature and humidity data, as well as airfield-specific pressure information, in the control tower.
more >A Vaisala PA50 aviation barometer system was supplied, installed and commissioned at Lee-on-Solent airfield, Hants, today by MetEngUK for the Hampshire Constabulary Air Support Unit.
more >Met Engineering Limited today took possession of the premises at Unit 3, Mode Wheel Road – the company’s new Manchester home.
more >MetEngUK latest ceilometer installation involved a Vaisala CT25K being installed and commissioned at RAF Wyton, near Huntingdon, for the Cambridge Constabulary Air Support Unit.
more >The commissioning of a Vaisala CT25K laser ceilometer was completed by MetEngUK today at Sheffield Airport.
more >